Heading 8405
Generators for producer or water gas with or without their purifiers acetylene gas generators and similar water process gas generators, with or without their purifiers
Subheadings (6 digits)
8405.10 | Generators; producer gas, water gas, acetylene gas and similar water process gas generators, with or without their purifiers |
8405.90 | Generators; parts of producer gas, water gas, acetylene gas and similar water process gas generators, with or without their purifiers |
National tariff lines
Nigeria tariff lines
| Code | Description | Import duty | Levy | Excise | Unit |
|---|---|---|---|---|---|
8405.10.00.00 | Producer/acetylene gas or water gas generators, with or without their purifiers; | 5% | 0% | 0% | KG |
8405.90.00.00 | Parts of article of heading 84.05 | 5% | 0% | 0% | KG |
From the official tariff loaded in Kontena AI.
Agencies that may control these goods in Nigeria
- Standards Organisation of Nigeria (SON) — SONCAP — Manufactured goods need a SON Product Certificate (PC), activated on the NSW before the Form M, and a SONCAP Certificate (SC) for each shipment.
Agencies that may control these goods in Ghana
- Ghana Standards Authority (GSA) — conformity assessment — Many manufactured goods (the GSA's high-risk list) are inspected or need a GSA conformity certificate before release.
Agencies that may control these goods in Kenya
- Kenya Bureau of Standards (KEBS) — PVoC Certificate of Conformity — Goods covered by the PVoC programme (most manufactured goods and many foods) need a Certificate of Conformity issued in the exporting country before shipment.
Kontena AI never submits to Customs, the National Single Window or any agency, and never signs documents on anyone’s behalf. A licensed customs agent always lodges, with their own account.
Nomenclature: WCO Harmonized System 2022 (via UN Comtrade).
Check your documents free
Upload your documents and Kontena AI cross-checks every one against the others, shows exactly what to fix, then prepares submission-ready documents.
Last reviewed: 2026-11-08. Requirements change. Confirm with the authority or your licensed agent before you ship.